Project in Bruney
A project in Brunei utilized our immersion container solution to maintain stable, energy-efficient ASIC mining operations in the region’s hot, humid tropical climate, where temperatures remain between 29°C and 35°C throughout the year. The installation achieved an impressive PUE of 1.04.
Key Project Info
- ASIC count: 192 unit
- ASIC model: M30S 100TH, 3400W
- Cooling power: 30kW
Key Project Outcomes
- Uptime: 99,9%
- General power: 653 kW
- Overclocking: +50%
- PUE: 1,04