Supports Multiple ASIC Models Antminer, Whatsminer, Auradine, Bitdeer

Hydro Cooling Systems

Hydro cooling systems deliver reliable and highly efficient cooling for cryptocurrency mining equipment. By using liquid coolant instead of air, they keep stable operating temperatures even under heavy loads, ensuring consistent hashrates and preventing performance drops.

Hydro cooling container with control racks

Hydro Racks Product Line

  • Hydro Rack

    BiXBiT WHR-200-2U

    BiXBiT WHR-200-2U
    200 kW
    Asic type Whatsminer 2U
    ASIC type Whatsminer 2U - 20 Units
    Antminer 3U - 15 Units
  • Hydro Rack

    BiXBiT AHR-200

    BiXBiT AHR-200
    200 kW
    Antminer S23/S21/S19 Hydro
    ASIC count 36 Units

Hydro Containers Product Line

  • Hydro Container

    BiXBiT WHC-1.2-2U

    BiXBiT WHC-1.2-2U
    1.2 MW
    Asic type Whatsminer 2U
    ASIC count 120 Units
  • Hydro Container

    BiXBiT WHC-2.4-2U

    BiXBiT WHC-2.4-2U
    2.4 MW
    Asic type Whatsminer 2U
    ASIC count 240 Units
  • Hydro Container

    BiXBiT HWCluster-2.4

    BiXBiT HWCluster-2.4
    2.4 MW
    Antminer S23/S21/S19 Hydro
    ASIC count 240 Units
  • Hydro Container

    BiXBiT AHC-2.4

    BiXBiT AHC-2.4
    2.4 MW
    Antminer S23/S21/S19 Hydro
    ASIC count 420 Units

Have a project in mind?
Let’s find the right solution.

Get a commercial offer

End-to-End
Mining Farm Solution

A ready-to-deploy solution for launching and scaling mining operations —
from infrastructure planning to stable day-to-day performance.

  • Project Assessment &<br> Strategic Planning

    Project Assessment &
    Strategic Planning

  • Mining Farm Engineering <br>& Design

    Mining Farm Engineering
    & Design

  •  Equipment & Infrastructure Optimization

    Equipment & Infrastructure Optimization

  • Construction,<br> Deployment & Commissioning

    Construction,
    Deployment & Commissioning

  • Efficient, Scalable <br>Mining Operations

    Efficient, Scalable
    Mining Operations

Request a quote

BiXBiT Ecosystem — 
one solution for your business

BiXBiT builds a fully integrated ecosystem for mining and high‑density compute where containers, cooling, power, firmware and monitoring operate as one. Software is embedded directly into the hardware, enabling full real‑time visibility across all systems from the moment you connect the site. This unified architecture accelerates deployment, reduces integration risk and scales effortlessly as new modules automatically join the ecosystem under a single monitoring and control platform.

BiXBiT Ecosystem

Automated Monitoring System (AMS)

Immersion Cooling Systems

Firmware for 
Whatsminer and Antminer

Power Distribution Units (PDU)

Hydro Cooling Systems

Case study
Project in the USA 2026
In 2026, a U.S. client selected a turnkey, high-availability containerized solution featuring a custom 1.2 MW hydro-cooling system for a high-density mining environment, with full redundancy and BiXBiT AMS integration.
Key Project Info
Key Project Outcomes
  • Uptime: 99,9%
  • PUE: 1,02
Project in the USA
A U.S.-based client (under NDA) selected our immersion container solution to ensure stable, efficient ASIC mining performance in demanding climate conditions, with temperatures ranging from - 40°C to +40°C between May and October.
Key Project Info
  • ASIC count: 120 unit
  • ASIC model: S19Jpro 150TH, 5000W
  • Cooling power: 30kW
Key Project Outcomes
  • Uptime: 99,9%
  • General power: 600 kW
  • Overclocking: +50%
  • PUE: 1,05
Project in Malaysia
A Malaysia-based client chose our immersion solution to maintain stable, efficient ASIC mining operations in a highly humid and unstable climate, with temperatures reaching around 33°C from February to October.
Key Project Info
  • ASIC count: 336 unit
  • ASIC model: M30S 100TH, 3400W
  • Cooling power: 56kW
Key Project Outcomes
  • Uptime: 99,9%
  • General power: 1142kW
  • Overclocking: +50%
  • PUE: 1,05
Project in Bruney
A project in Brunei utilized our immersion container solution to maintain stable, energy-efficient ASIC mining operations in the region’s hot, humid tropical climate, where temperatures remain between 29°C and 35°C throughout the year. The installation achieved an impressive PUE of 1.04.
Key Project Info
  • ASIC count: 192 unit
  • ASIC model: M30S 100TH, 3400W
  • Cooling power: 30kW
Key Project Outcomes
  • Uptime: 99,9%
  • General power: 653 kW
  • Overclocking: +50%
  • PUE: 1,04
Request a quote

BiXBiT AMS — Your Central Hub for Monitoring and Management

Full control over your mining infrastructure from anywhere in the world. BiXBiT AMS brings together the container, ASIC devices, and PDUs into a unified monitoring and management system, allowing you to track equipment performance, manage power, and prevent downtime remotely.

Request a quote
BiXBiT AMS

Engineering and Project Design Services

We offer full-cycle engineering and project design services tailored to your mining infrastructure needs. Our team can develop a complete technical solution based on your goals, site conditions, and performance requirements.

As part of the project, we will define the optimal configuration of the mining container, select the most efficient cooling system, and ensure seamless integration of all components.

As part of the project, we will define the optimal configuration of the mining container, select the most efficient cooling system, and ensure seamless integration of all components.

From initial concept and technical calculations to finalized blueprints and deployment planning, we provide a clear, precise, and reliable design package that forms the foundation for a high-performance and scalable mining operation.

From initial concept and technical calculations to finalized blueprints and deployment planning, we provide a clear, precise, and reliable design package that forms the foundation for a high-performance and scalable mining operation.

Heat Reuse

Heat Reuse

From Waste Heat to Valuable Resource

Mining heat doesn’t have to be wasted. Modern cooling systems capture and repurpose excess heat, transforming mining into an efficient energy solution.

Heat Recovery That Works Anywhere

Up to 95% of mining heat can be recovered and repurposed. Advanced cooling systems transform excess energy into useful heat for homes, greenhouses, pools, and industrial applications.

Sustainability and Profitability in One System

Heat recovery reduces operating costs, improves efficiency, and supports a more sustainable mining model. Instead of wasting energy, smart mining infrastructure turns every output into measurable value.

BiXBiT Building

Have a project in mind? Let’s find the right solution